
The proposed improvements to Quince Orchard Boulevard under the project will include pavement and sidewalk reconstruction, the removal and replacement of existing trees, the installation of storm water management (SWM) infrastructure, and improvements to the storm drain network as well as other roadway related activities.
Additionally, it will include the design of a Shared Use Path along Quince Orchard Boulevard from Firstfield Drive and along Rabbitt Road from Quince Orchard Boulevard to the Youth Center. The design is currently coordinating with utilities as of April 2024.