Lots of Progress on New Rio Playground
The new inclusive playground at Rio Lakefront has really taken shape lately as almost all of the equipment has been installed.
The playground will be along the opposite side of the boardwalk, just past the carousel. It’s expected to be ready to open this summer.
As of now, it’s still taped off and surrounded by dirt, but it looks like the only thing left to do is adding the playground flooring.
Below you’ll see a few pictures and a video of how the playground looks now.
New playground will open at @RIOLakefront this summerhttps://t.co/9ULKOD86pL pic.twitter.com/zRBA2bzwWc
— The MoCoShow (MCS) (@TheMoCoShow) June 9, 2021