It has been nearly three years since we reported that CVS would be taking over the old Tommy Joe’s/Boulevard Tavern/Brasserie Beck/O’Donnell’s location in the Kentlands.Construction is progressing, as the frame of the building is about halfway up. There’s no timetable for when it will be ready, but it could be ready to go by the end of the summer.
Gaithersburg Councilmember Neil Harris told us that CVS would be moving forward with the plan back in 2019. Demolition of the old building occurred in November with construction starting soon after.